Faryuan 2U Front/Rear Metered Rack PDU, 30A 208V/240V C13+C19Faryuan 2U Front/Rear Metered Rack PDU, 30A 208V/240V C13+C19
      SBE80 forklift anderson connector
      SBE80 forklift anderson connector
      SBE80 forklift anderson connector
      SBE80 forklift anderson connector
      SBE80 forklift anderson connector
      SBE80 forklift anderson connector
      SBE80 forklift anderson connector

      SBE80 forklift anderson connector

      Review(0)
      $3.33
      缺貨

      SBE 80 anderson new 2-pole connector

      Assembly instruction for SBE®80 & SBO®60 Series
      two pole battery connectors with option for auxiliary contacts.

      Quantity :
      No Product available
        SBE80 forklift anderson connector

        Assembly instruction for SBE®80 & SBO®60 Series
        two pole battery connectors with option for auxiliary contacts.

        1. CONNECTOR RATINGS
        2. TOOLING CHART
        3. REDUCING BUSHING
        4. CABLE STRIPPING DIMENSIONS FOR PRIMARY POWER CONTACTS
        Max Cable Size
        Series Amperes Volts AWG mm²
        SBE80 80 150 #6 16mm2
        SBO60 60 600 #6 16mm2
        Bushing Wire Size For Use With
        Part Number AWG (mm²) Contact Part Number
        5910 #10-12 (5.3 - 3.3) 1339G1
        5912 #8 (8.4) 1399G1

         

        Catalog Wire Retaining
        Number Application Contact Size Pin Length
        6344 SBE80, SBE160, SBO60, SBX175 1331 #12/16 0.85

        3b. To Solder: Not recommended.
        4. Thread or push one or two auxiliary contacts and wires through the rear of the connector before
        inserting into auxiliary housings. Push into auxiliary housings through rear until notched side of
        contact tip snaps over spring. Tug wires to make sure wires are secure.
        5. Slide two auxiliary Powerpole housings together by dovetails to stack vertically. They cannot be
        inserted separately into SBE/SBO housing. The rear of each of the Powerpole housings must
        be flush.
        6. Slide stacked auxiliaries back into connector housing until seated. The male dovetail should be
        on top as shown in Figure 1. Make sure side grooves of auxiliaries are aligned for retaining pins
        and insert tubular pins. Tap pins in holes from top, as shown in Figure 1.
        [7.9]
        0.31 [139]
        5.5
        SBE® & SBO® Auxiliary Contact
        Assembly Instructions
        Catalog Wire Retaining
        Number Application Contact Size Pin Length
        6344 SBE80, SBE160, SBO60, SBX175 1331 #12/16 0.85
        Crimp Tool Catalog Number
        Manual - cycle controlled 1309G2
        Pneumatic - cycle controlled 1367G1
        NOTE: These assembly instructions apply only to the catalog numbers listed below. For instructions
        to assemble the 1x4 Auxiliary Connector, use instruction 1S6229. Instruction 1S6229 is provided
        with all 1x4 Auxiliary Kits.
        7. Cable ties are supplied to secure the auxiliary leads or cable to one of the main power cables.
        Leave slack or loop in leads to Powerpole contacts when applying cable ties. Wraps to be
        placed approximately 1 inch (25.4mm) apart as shown in Figure 2.

         

         

        具體參考

        No customer reviews for the moment.

        Write your review
        SBE80 forklift anderson connector

        16 個同類商品:

        SBE80 forklift anderson connector

        SBE80 forklift anderson connector

        $3.33